ACCESS
ROAD AND RURAL ROAD CONSTRUCTION PROJECT:
Mek Consultants Co., Ltd. has
carried out the following major Project:
|
Client:
Financing agency
UNCDF |
Paklay – Kenthao Road Rehabilitation Project,
Sayaboury Province.
June 1998 to April 2001
Project’s requirements comprise the
topographic survey, geo-tech investigation, hydrologic
study, detailed engineering design, preparation of bill
of quantity, tender documents, and construction
supervision.
Our services provided includes
topographical survey and mapping using GPS, Total
Stations and Software "Softdesk – Civil/Survey";
geo-technical investigation and soil testing and
analysis; hydrologic study on peak surface runoff for
drainage discharge along the road alignment; detailed
engineering design of the road using software "Softdesk
– Civil/Survey" and of the drainage structures (Concrete
bridge of length 34 m) using AutoCAD 14; preparation of
bill of quantity and engineering cost estimate;
preparation of tender documents; and construction
supervision.
|
|
Client:
Financing agency
Lao-Luxembourg Agency,
Bolikhamxay Province.
|
Rural Gravel Road Construction
Project, Bolikhamxay Province.
April 2001 to July 2003
Project’s requirements comprise the
detailed topographical survey, engineering design,
provision of tender documents, construction supervision,
and training.
Our services included the
topographical survey, soil tests, hydrologic study,
detailed engineering design of two roads
Phonyeng-Phonsong 8 Km and from Thasi-Xiengleu 30 Km
with cross drainage culverts, preparation of tender
documents and assisting in evaluation of contractors,
and construction supervision during construction period
and defect liability period.
|
|
Client:
Financing agency
U.S.A Embassy
|
Road Construction Project from Ban
Donmoune to Ban Houay Ngeun, Khob District, Sayaboury
Province.
December 2003 to July 2004
Project’s requirements comprise the
detailed investigation, engineering design, provision of
tender documents, and construction supervision.
Our services included the topographic
survey, geologic investigation, engineering design
provision of tender documents, and construction
supervision.
|
|
Client:
Financing agency
U.S.A Embassy
|
Rural Road Construction Project in
Samphanh District, Phongsaly Province.
December 2003 to December 2005
Project’s requirements comprise the
detailed investigation, engineering design, provision of
tender documents, and construction supervision.
Our services included the road
survey, detailed design, and construction supervision
throughout the defect liability period 12 months after
the construction finished for the rural road in Samphanh
district, Phongsaly province.
|
|
Client:
Financing agency
PRODESSA (AFD)
|
Rural Development of 4 Southern
Districts Project, Sayaboury Province.
January 2004 to January 2005
Project’s requirements comprise the
detailed topographical survey and engineering design,
preparation of tender documents, bid evaluation, report,
and construction supervision.
Our services included road survey,
detailed design, and construction supervision,
continuously until the maintenance period expired.
|
|
Client:
Financing agency
Lao National Commission for
Drug Control & Supervision (LCDC) And United Nations Office
on Drugs and Crime, Lao PDR.
|
Program Facility Unit, Phongsaly
Province.
March 2004 to April 2006
Project’s requirements comprise the
detailed investigation, engineering design for rural
road, preparation of tender documents, bid evaluation,
report, and construction supervision.
Our services included the detailed topographical survey
and detailed design, provision of tender documents, and
construction supervision.
|
|
Client:
Financing agency
International Development
Association (IDA).
|
Topographic Survey and Soil
Investigation (in 11 different locations from Vientiane
to Champasak).
May 2004 to June 2004
Project’s requirements comprise the
topographic and soil investigation.
Our services included the topographic
survey, provision of mapping as required scale, and soil
investigation.
|
|
Client:
Financing agency
Ministry of Communication
Transport Post and
Construction (MCTPC).
|
Road Maintenance Program-Phase 2 (RMP-2).
May 2004 to June 2004
Project’s requirements comprise work
in the road Heavy Traffic Management (HTM)
Our services included the
review/summarize the previous studies, propose an update
strategy, preparation component description, cost
estimation, cost benefit analysis, implementation
arrangements/plan and monitoring indicators and work
carried out in the road Heavy Traffic Management (HTM).
|
|
Client:
Financing agency
Ministry of Communication
Transport Post and
Construction (MCTPC).
|
Road Maintenance System Project, 17
Provinces and 1 Special Zone.
February 2005 to April 2005
The project’s requirements comprise
the statistic survey for road and bridge’s conditions,
socio-economic, accident condition, traffic count and
axles load.
Our services included the survey data
collection for roads and bridges’ conditions on the
national road and Old Provincial Road, and survey data
collection for New Road Alignment by using GPS, roads
and bridges’ histories, roads and bridges’ conditions,
socio-economic, accident condition, traffic count and
axles load on the New Provincial Proposed Road. Data
entry into the Road Management System (RMS-2005) and
report to MCTPC.
|
|
Client:
Financing agency
Agence Francaise de Development (AFD).
|
Programme de Capitalization en Appui
a la Politique de Developpement Rural Point
d’Application du Sud Sayabouri., (PCADR-PASS).
09 September 2005 to 31 July 2006
The project aim is to develop the 4
southern districts namely Kenthao, Botene, Paklai and
Thongmixay especially the upgrading of the villager
living condition in the region.
Comprises the detailed investigation,
engineering survey/design for the rural road,
preparation of tender documents, bid evaluation, report,
and construction supervision.
|
|
Client:
Committee for
planning and Investment.
Poverty Reduction Fund (PRF)
|
TECHNICAL ASSESSMENT 2006;
(Provinces: Huoaphan, Xiengkhuoang, Savannakhet,
Saravane and champasak).
15 September 2005 to 30 November 2006
The
objectives of the PRF
The three
main objectives of the PRF are to:
· Assist
the villagers to develop community infrastructure
and gain improved access to services and income
generation;
· Build
capacity and empower poor villagers in poor
districts to plan, manage and implement their own
public investment in a decentralized and transparent
manner; and
· Strengthen
local institutions to support participatory
decision-making and conflict resolution processes at
the village, khet, and district levels, involving a
broad range of villagers, including women, the poor
and ethnic minorities.
The Services is Comprised of
Technical Assessment:
(i) Assess
the quality of the civil works, the manner and the
management of their implementation, and the value of
community participation in its implementation.
(ii) Review
the environmental impact of the sub-project; inspect
the maintenance activities and issues; and provide
recommendations for the program improvement in the
future.
|
|
Client:
GAMUDA, (Malaysia).
|
Nam Theun 1 Hydroelectric Power
Project, Bolikhamxay Province.
10 September 2006 to 03 December 2007
The project aim is to topographical
Survey, Design and construct of the Asphalt access road
6.0 m width to dam site for 8.8 km long.
Comprises the detailed investigation,
engineering survey/design for the access road to dam
site, preparation of tender documents, bid evaluation,
report, and construction supervision.
01 February 2009 to 30 April 2007
Survey and Design of the Base Camp for whole
project.
Comprises the detailed investigation,
engineering survey/design for Soil Survey, Buildings
Design (Site office 100 staffs; quarter for single and
double rooms, Canteen, Club house First Aid House…),
preparation of tender documents, bid evaluation, report.
|
|
Client:
THEUN-HINBOUN POWER COMPANY LIMITED. (THPC).
[Social & Environmental Division (SED)]
|
Resettlement Road from Nong Kok to
Nong Xong, (18Km). Khamkeuth District,
Borikhamxay Province.
16 January 2008 to 29 February 2008
The project aim is to do the detailed
investigation, engineering survey/design for the
gravelling road of 7 m wide, 18 km long.
The Services of works comprises the
detailed investigation, engineering survey/design for
the gravelling road of 7 m wide, 18 km long. preparation
of tender documents, bid evaluation, report:
· Field
survey work with regard to the road alignment, culvert
locations, drainage and surface water runoff and
identification of problem areas.
· Soil
investigations.
· Hydrological
investigations.
· Applying
national standards.
· Bills
of Quantities.
· Establishment
of a quality and quantity control test standards and
procedures to be used during the construction phase.
The design for the road includes any
stream and crossing structures.
|
|
Client:
Thai Airports
Ground Services Limited (TAGS), (Thailand).
|
Road Construction Project, in Resettlement Village of
SAVAN-SENO Special Economic Zone.
11 November
2007 to 29 December 2007
The
details work consisted of Two mains activities.
1.
Land use survey, road alignment and
details surveying works,
2.
Details cost estimations.
The following details task assigned.
-
Round trip two lens road survey,
including middle concrete curve,
-
Design for Asphaltic pavement,
-
Design for both side pedestrians with
concrete, width 2m,
-
Design for drainages,
-
Design for lighting system,
-
Design for
traffic sign board.
Comprises the
detailed investigation, engineering survey/design and
cost estimate for Road construction (Guide, Maintenance
Marker, and KM Posts Details; Pavement Markings, Types
and details; Traffic Sign, Road Markings, Concrete Side
walk, Lighting and Electrical works, Reinforcement
Details of Cradle R.C.P.C.; Road asphalt), preparation
of tender documents, bid evaluation, report.
|
|