FEASIBILITY STUDY AND
HYDROELECTRIC POWER PROJECT:
Mek Consultants Co., Ltd. has
carried out the following major Project:
|
Client:
Financing agency
Ministry of Industry and Handicraft (EDL) |
Nam Mang 3 Hydropower Development
Project, Vientiane Province.
January 1994 to July 1994
Project’s requirements comprise the Environmental
Impact Assessment (EIA).
Our services included socio-economic
survey and environmental study, Field investigation,
data collection and analysis, Land use planning and
mapping, Preliminary resettlement planning and cost
evaluation, water quality, aquatic ecology and fishery
survey, wildlife habitats and forest survey, land use
survey and consultation workshops with village, district
level, topographical survey/mapping scale 1:2,000,
geological investigation, and hydrological study in the
areas of upstream and down stream of Nam Ngon river.
Report writing on environmental and socio-economic
study.
|
|
Client:
Financing agency
Asian Development Bank (ADB) |
Nam Ngum River Basin Development
Project, Vientiane Province, Saysomboun Special Zone.
May 2001 to April 2002.
Project’s requirements comprise the
development of integrated circuit around Nam Ngum basin,
and strategic planning.
Our services included data collection
and analysis, preparation of Basin Profile, Strategy and
Action Agenda, assisting in carrying out the feasibility
studies of investment options, assisting in conducting
workshops and preparing the draft final report.
|
|
Client:
Financing agency
Lao-Korea Company. |
Xe Piane-Xe Namnoy Update Feasibility
Study for Hydro Electric Power Project,
Champasak-Attapeu Provinces.
June 2004 to December 2004
The project’s requirements comprise
update of EIA study, socio-economic study, topographic
survey, geologic investigation, and hydrographic study.
Our services included audit and
update of existing water resource data river basin, Data
collection, entry and checking to a basin data base,
Review and recommendations for improvement of basin
hydro-climatic network, Implementation of improvements
of basin hydro-climatic network, Hydrological study.
socio-economic survey and environmental study (Access
road, Transmission line corridors, social condition and
social structure, land tenure and etc.), Field
investigation, data collection and analysis, Land use
planning and mapping, Preliminary resettlement planning
and cost evaluation and consultation workshops with
village, district level geological investigation, Report
writing on environmental and socio-economic study.
|
|
Client:
Financing agency
Nice Engineering Limited.
(Thailand) |
Nam Hao Feasibility Study for Hydro
Electric Power Project, Houaphanh Province.
September 2004 to February 2005
The project’s requirements comprise feasibility
study:
Socio-economic study, environmental
study, topographic survey, geological investigation, and
hydrological study.
Our services included the
socio-economic survey (access road, transmission line,
public building, agriculture and etc.), water quality,
aquatic ecology and fishery survey, wildlife habitats
and forest survey, land use survey and consultation
workshops with village, district level, detailed
topographical survey/mapping scale 1:2,000, geological
investigation, and hydrological study.
|
|
Client:
Financing agency
Kansai Electric Power Company (Kansai)/ITELCO
INC. (Japan) |
Xe Katam Hydroelectric Power Project,
Champasak Province.
January 2005 to April 2005
The project’s requirements comprise
topographical survey and mapping scale 1: 2,500.
Our services included the
establishment of reference bench marks, survey closing
traverses, running the elevations, detailed topographic
survey and provision of maps as required scales for 3
different special areas, (about 5 km2) in which located
in the dam area as defined by the Client.
|
|
Client:
Financing agency
Kansai Electric Power Company (Kansai)/
NEWJEC Inc. (Japan) |
Xe Katam Hydroelectric Power Project,
Champasak Province.
15 June 2005 to January
2007
The project’s requirements comprise
of conducting selected technical studies to support the
Initial Environment Examination (IEE) and Environmental
Impact Assessment (EIA) for the Xe katam Hydroelectric
Power Project.
(IEE): Our services included of
management and coordination the portions of the work to
meet due dates for interim work products to be delivered
to the project developer as well as the overall schedule
for completing the studies. We collected relevant data
to enable more in – depth evaluation of Initial
Environment Examination for the Xe katam
Hydroelectric Power Project in order to assess the
impacts on the project and elaborate the appropriated
mitigation measures. We conducted the necessary detailed
environmental studies and preparation of an Initial
Environment Examination Environmental Report for
the proposed Project. This will include the following
types of information.
(EIA): In the planning,
designing, development and implementation of the Xekatam
Hydroelectric Power Project, direct, indirect and
cumulative negative impacts on the environment (both
natural and socio-economic components) shall be taken
into account over a suitable timeframe. These impacts
shall be evaluated and appropriate mitigation and
compensation measures shall be taken, as well as a
formal environmental management plan created through the
preparation of an Environmental Impact Assessment (EIA).
In the work of this EIA, impacts on air, water, soil,
and ecosystems; land use patterns and resettlement;
ethnicity and indigenous people; cultural heritage and
archaeological resources; gender; and, health conditions
shall be examined.
|
|
Client:
Kansai Electric Power Company (Kansai)/ITELCO
INC. (Japan) |
Nam Ngiep Hydroelectric Power Project
Borikan District, Bolikhamxay
Province.; Hom District, Vientiane Province and Thathom
District, Xiengkhuang Province.
From January 2006 to February 2008
(Interval time sections)
Our services included the
establishment of reference bench marks by GPS, long
distant leveling (195 km), survey closing traverses,
detailed topographic survey, Longitudinal and 70
cross-sections survey of (40 km) along river and rivers
bank scale 1:2000, (total area approximately 800 ha,
which divided into 3 sites).Survey and marked the wooden
pegs at every 5 m interval for seismic reflection line
test. To mark the full surface level (FSL) of elevation
320 with the concrete bacons for the 8 villages.
Blasting and assist the specialist for the seismic test
and record. Improvement of 25 km access road to the dam
site. Set up a water staff gauge station. To coordinate
and supply of lifting boring machine with Army
helicopter and etc.
|
|
Client:
CHINA INTERNATIONAL WATER & ELECTRIC
CORP. |
Nam Lik 1-2 Hydroelectric Power
Project, Vientiane Province.
03 November 2006 to 15 January 2007
The project’s requirements comprise
topographical survey and mapping scale 1: 2,500.
Our services included the
establishment of reference bench marks (2 GPS Points),
survey closing traverses, running the elevations,
detailed topographic survey and mapping as followings:
I. Topographic Survey for Main Structure Area.
a. Main dam Area ( 2,1 km² ),
b. Saddle dam Area ( 1,7 km² ),
II. Longitudinal and Cross-Sections Survey of river.
a. One Longitudinal Section ( 750 m ),
b. Three Cross-Section Approx. ( 900 m ),
III. Topographic survey for borrow area and quarry
- Survey area is about 2 km² the scale is 1:2000
IV. Cooperation survey for geology.
- Geological cross section survey is about 20 km
- Setting out for about 1100 of geological and
investigation points.
V. Desk Work; Data Entry,