WATER SUPPLY,
INTEGRATED RURAL DEVELOPMENT AND OTHERS:
Mek Consultants Co., Ltd.
has carried out the following major Projects:
|
Client:
Financing agency
Ministry of
Communication Transport Post and Construction (MCTPC) |
Vientiane Integrated Urban
Development Project, Vientiane Municipality.
November 1993 to June 1994
Project’s requirements comprise the
improvement of city land use, road and drainage
networks, and traffic control system.
Our services included the
socio-economic and land use survey, inventory of the
existing city roads and drains, preliminary designs and
cost estimate of shelters and houses for improvement of
slums.
|
|
Client:
Financing agency
Australian Agency
for International
Development (AusAID).
|
Huay Sone - Huay Sua Integrated
Village Development Project, Vientiane Municipality.
September 1999 to June 2001
Project’s requirements comprise the
community development, training and HRD, integrated
agricultural development, water resource development,
natural resource management, and project resource
management.
Our services included the topographic
survey, geological investigation, aerial photo
interpretation, GIS, land use planning for watershed
management, engineering design, preparation of bill of
quantities, construction supervision of irrigation
systems and domestic water supply networks, community
development, formation of village revolving fund
committees (rural credits), producers groups, water user
groups, spring user groups, bore well user groups,
shallow well user groups and training, livestock and
veterinary development, crop trials, demonstration and
agricultural extension, management of information system
(MIS), and project resource management.
|
|
Client:
Financing agency
BTC – LAO/01/004 |
Village Development Programme in
Savannakhet Province.
April 2005 to May 2005
The project’s requirements comprise
to conducting water pump test scheme in Nong district
capital.
Our services are to drill about 6 new
boreholes in the district capital. 2 or 3 of them had a
good yield after drilling (estimated at about 21/sec).
The boreholes were drilled between 50 to 60 meters deep
and provided with PVC casing of 150mm.
|
|
Client:
Financing agency
Department of
Communication Transport Post and Construction, Phongsaly
Province.
(Cr. IDA Credit No.3131 LA.) |
Provincial Infrastructure Project (Phongsaly & Oudomxay
)
Urban Water Supply Component/MuangKhoua Sub-Component.
05 November 2005 to 30 December 2006
The project was consisted of the
services for the Improvement of the water supply system
in Muang Khoua Town and Feasibility study of options for
improving the water supply in Phongsaly Town.
Comprises Feasibility study,
engineering survey/ detail design for the water supply
in Phongsaly Town including preparation of tender
documents, bid evaluation, final report and construction
supervision.
|
|
Client:
GRET, “Groupe de
Recherches et d’Echanges Technologiques.
Contract No.
DW-MF-190207 |
MIREP Programme in Lao PDR,
Design a Small Piped Water System
Meuang Feuang District, Vientiane Province.
19
February 2007 to 03 April 2007
Out line
Technical options definition, design sizes the hydraulic
facilities and technical drawing. These works also
included topographic survey, field data collection, cost
estimation and general details layout Plan.
The
Services included of Feasibility Study, definition of
the best technical options, survey and design works,
preparing BoQ and Technical Reports of the Small
Drinking Piped Water System of Meuang Feuang, Vientiane
Province.
|
|
Client:
World Vision Lao
Bolikhamxay Province.
No. L31-179668. |
Pakkading Water Supply and Sanitation Project,
14
Target Village of
Pakkading District, Bolikhamxay Province.
22
February 2007 to 05 September 2007
Hand dug well
drilling and Equipment’s installation, including
chemical and mineral contamination testing.
Comprises the
detailed investigation, Engineering/ Supervised of the
Well Drilling and Construction 52 bore holes in 14
Target villages, including of Water Quality Test.
|
|
Client:
Financing agency
Department of Communication Transport Post and Construction
of Sayaboury Province |
Lao Airports Improvement Project,
Sayaboury Province.
May 1997 to November 1997
Project’s requirements
comprise the widening and paving by using DBST for
runway and parking area.
Our services included construction
supervision, survey check, quality control and
certification for the payment.
|
|
Client:
Financing agency
Ministry of Agriculture Forestry/IDA |
Lao Upland Agricultural Development Project.
January 1993 to December 1994
Project’s requirements comprise the
development of feeder roads, irrigation schemes and
agricultural extension in upland regions in five
provinces.
Our services included the
construction supervision of feeder roads in Vientiane
and two southern provinces, operation and maintenance of
pumping irrigation schemes, establishment and
strengthening of water user groups, development of water
management principles and practice based upon users’
orientation, improvement of irrigated crop production
and strengthening of agency in charge of the project for
replication in the future.
|
|